Offshore Wind Farm Massachusetts

Offshore Geotechnical Site Investigation

0m
Maximum water depth
0m
Maximum drilling depth
0m
Sample and CPT depth
0m
CPT seabed penetration depth
0days
Project duration

Geoquip Marine completed a large geotechnical campaign for a major US offshore wind farm developer off the coast of Massachusetts, USA.

The Dina Polaris was mobilised from the Middle East for this campaign which consisted of seabed and downhole cone penetration testing (for seismic testing) and downhole sampling equipment. Over a period of 81 days Geoquip Marine completed over 2500m of deep seabed cone penetration testing and in excess of 2000m of downhole testing with only 6 days downtime due to weather.

All operations were completed in line with the wind farm developer’s expectations and without safety incidences or environmental damage.

PROJECT DETAILS

This investigation was conducted for a major US offshore wind farm developer.

INDUSTRY

Offshore Wind Farm.

DATE STARTED

25 April, 2018

TESTS PERFORMED

Seismic CPTU, seabed CPTU, downhole sampling, downhole CPTU.

EQUIPMENT USED

Dina Polaris exiting port seabound with GMTR120

DINA POLARIS + GMTR120

HSE PERFORMANCE

The project was completed without incident.

LOCATION

Just south of Martha’s Vineyard.